Whirlpool WGFD293 Instruction Manual Page 22

  • Download
  • Add to my manuals
  • Print
  • Page
    / 52
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 21
22
Upright Standard Connections—Left Side Upflow
(Counterflow Similar)
Upright Drain Trap Mounting—Left or Right Side
Panel
1. Insert the drain tubes into the drain trap and position the
drain trap against the side panel.
NOTE: Drain tubes must reach the bottom of the drain trap.
2. Secure the drain trap to the side panel at the mounting holes
(dimples or crosshairs on counterflow models) located below
the grommet drain holes.
3. Attach the PVC drain line to the drain trap outlet with either a
90° elbow or coupling.
Horizontal Installations—Right Side Down
Horizontal installations with the right side down require that the
drain hoses be connected to the right side front cover drain port
and the rubber elbow drain port.
NOTE: On counterflow models, relocation of the front cover
pressure switch hose is required.
Make connections as follows:
1. Remove the rubber plug from the right side of the front cover
drain port.
NOTE: On counterflow furnaces, relocate the front cover
pressure switch hose connection from the left side pressure
tap to the right (down) side tap to guard against blocked drain
conditions. Cut the hose to appropriate length to minimize
sagging. Plug the left (unused) pressure tap with the plug
removed from right side.
2. Secure Hose A to the front cover drain tap with a red hose
clamp.
3. Route Hose A to the rear right (down) side panel grommet
holes.
4. Cut ¹⁄" (6.4 cm) from the end of the drain port on the
externally mounted rubber elbow. Discard cut portion.
5. Insert Tube 1 into the rubber elbow drain port and secure with
a silver hose clamp.
NOTE: Angle tube outward toward front of furnace.
6. Cut 17³⁄₄" (45.1 cm) from the long end of Hose B. Discard cut
portion.
7. Secure the remaining end of Hose B to exposed end of Tube
1 with a green hose clamp.
8. Route Hose B to the front right (down) side panel grommet
holes.
9. Cut 5¹⁄" (14 cm) straight length from the long end of each
Tube 2. Discard the radius pieces.
10. Insert approximately 1" (2.5 cm) of each Tube 2 through the
right (down) side panel grommet holes.
11. Secure the tubes to Hose A and Hose B using the green hose
clamps.
NOTE: Ensure that the hoses and tubes maintain a
downward slope for proper drainage and are not kinked or
bound.
For details concerning the mounting of the drain trap, refer to
“Horizontal Drain Trap Mounting” in “Condensate Drain Lines and
Drain Trap.”
Horizontal Upflow Connections—Right Side Down
(Counterflow Similar)
A. Left side panel
B. Rubber elbow
C. Rubber elbow
drain port
D. Silver hose clamp
E. Tube 1
F. Green hose clamps (3)
G. Hose B
H. Drain trap
I. Tubes 2
J. Side panel drain holes
K. Hose A
L. Front cover drain port
Cabinet Width
Models
(kBtu/Tons)
X Length to Cut from
Long End of Hose B
17¹⁄₂" (44.5 cm) 45_30 7" (17.8 cm)
21" (53.4 cm) 70_40 3¹⁄₂" (8.89 cm)
24¹⁄₂" (62.3 cm) 090_50 None
115_50
A
B
C
D
E
H
F
G
I
J
K
L
M
F
A. Front cover drain port
B. Front cover pressure tap
C. Right side panel
D. Rubber elbow
E. Rubber elbow drain port
F. Si lv e r h o s e cl a m p
G. Tube 1
H. Green hose clamps (3)
I. Drain trap
J. Tubes 2
K. Hose B
L. Hose A
M. Red hose clamp
A
M
L
K
H
J
B
C
D
EFGH
I
Page view 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 51 52

Comments to this Manuals

No comments