Whirlpool 50 Hz Specifications Page 11

  • Download
  • Add to my manuals
  • Print
  • Page
    / 16
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 10
11
113312-2-BA (1093)
Kohler Co., Kohler WI
D. FIELD WIRING DIAGRAM - 120V, 60 HZ (-J1
MODELS ONLY)
Remove air actuator tubing from pump by gently pulling.
Next, remove the screw at the top of the pump near the
strain relief bushing. Save screw. Loosen screw at
bottom of pump. Remove pump cover to reveal field
wiring compartment.
The factory has prewired the whirlpool control system.
Provide a separate equipment grounding conductor for
the inside grounding conductor for the inside grounding
screw (14 AWG minimum). Ground must not be
connected to any current-carrying conductor except at
the main service breaker box (per National Electrical
Code, Article 250-61-b). A 120 V, 15 A separate circuit
is required.
Replace pump cover over field wiring compartment.
Fasten screw through cover at hole near strain relief at
top of pump. Tighten screw at bottom of pump. Snip off
approximately 1” of air actuator tubing and reattach to
pump. Make sure tubing is securely attached to pump.
Strain Relief Bushing
(Not Provided)
Air Actuator Tubing
Connection
White
(Neutral
)
Green (Ground)
Black (Line)
To Electrician: Pro-
vide enough wire to
allow motor removal
upon servicing.
E. FIELD WIRING CONTROL BOX
COMPARTMENT - 230V, 50 HZ
WARNING: Risk of electrical shock. Make sure
the power has been disconnected before
performing the following procedures. Refer to
Important Safety Instructions located on page 2.
CAUTION: Risk of electrical shock. All services
must have an Earth Leakage Circuit Breaker
(ELCB) which will provide additional protection
against line-to-ground shock hazard. A separate
service is required for the whirlpool.
The whirlpool controls and system have been prewired
at the factory. A licensed electrician should make a
routine service connection to the field wiring
compartment of the control box containing blue and
brown wires and earth lug.
* For bonding in accordance with National and Local
Codes.
Field Wiring
Compartment
Bonding
(Earthing) Lug*
Air
Actuator
Air
Actuator
Tube
Pump
Control
Box
Page view 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16

Comments to this Manuals

No comments