5. SITE REQUIREMENTS
A. OLD BATH REMOVAL (IF APPLICABLE)
Disconnect the drain at the trap. Remove old wall
material. Slip boards under old bath feet to protect
floor and slide old bath out of recess as illustrated.
Floor
Protection
Boards
Old Bath
B. SUBFLOOR PREPARATION
Check flooring under the bath and repair if necessary.
Make sure that the subfloor is level. Seal subfloor to
reduce the risk of water damage.
C. STUD POCKET PREPARATION
Construct a recess designed for your particular
installation. Whirlpool is intended, primarily, for drop-in
or sunken installation.
Framing is of 2 x 4 construction. Make sure you allow for
access to the pump or power panel in the event the unit
requires service. When constructing framing allow for
thickness of sub and finished wall materials.
Suggested stud construction is illustrated. Some
modifications may be needed for other types of
construction, if preferred.
D. PLUMBING PREPARATION
Position plumbing according to roughing-in dimensions.
Cap supplies and check for leaks.
6. BEFORE INSTALLING UNIT
A. PARTIALLY INSTALL BATH DRAIN
Install drain on bath/whirlpool according to
manufacturer’s instructions.
B. PROTECT BATH UNIT
Place a drop cloth or similar material in bath/whirlpool
bottom. Be careful not to scratch product.