15
Nondirect Vent Applications
Refer to the following tables for applicable length, elbows and pipe diameter for construction of the vent/flue pipe systems of a
nondirect vent (single pipe) installation. In addition to the vent/flue pipe, a single 90º elbow should be secured to the combustion air
intake to prevent inadvertent blockage. The tee used in the vent/flue termination must be included when determining the number of
elbows in the piping system.
NOTES:
■ One 90º elbow should be secured to the combustion air
intake connection.
■ Minimum requirement for each vent/flue pipe is 5 ft (1.5 m)
and 1 elbow/tee.
■ Tee used in the vent/flue termination must be included when
determining the number of elbows in the piping system.
■ 2¹⁄₂" or 3" (6.4 cm or 7.6 cm) diameter pipe can be used in
place of 2" (5.1 cm) diameter pipe.
■ Increased clearance configurations using two 45º long-sweep
elbows should be considered equivalent to one 90º elbow.
Vent/Flue Pipe Terminations
■ The vent/flue pipe may terminate vertically, as through a roof,
or horizontally, as through an outside wall.
■ Vertical vent/flue pipe terminations should be as shown in
“Vertical Vent Termination (Single Pipe)” illustration. Refer to
“Termination Locations” in this section for details concerning
location restrictions.
■ The penetration of the vent through the roof must be sealed
tight with proper flashing such as is used with a plastic
plumbing vent.
■ Horizontal vent/flue pipe terminations should be as shown in
“Horizontal Vent Termination (Single Pipe)” illustration. Refer
to “Termination Locations” in this section for details
concerning location restrictions.
■ A 2³⁄₈" (6.1 cm) diameter wall penetration is required for 2"
(5.1 cm) diameter pipe.
■ A 3" (7.6 cm) diameter hole is required for a 2¹⁄₂" (6.4 cm)
pipe.
■ A 3¹⁄₂" (8.9 cm) diameter hole is required for 3" (7.6 cm)
diameter pipe.
■ To secure the pipe passing through the wall and prohibit
damage to the piping connections, a coupling should be
installed on either side of the wall and solvent cemented to a
length of pipe connecting the 2 couplings.
■ The length of pipe should be the wall thickness plus the
depth of the socket fittings to be installed on the inside and
outside of the wall.
■ The wall penetration should be sealed with silicone caulking
material.
■ In a basement installation, the vent/flue pipe can be run
between joist spaces.
NOTE: If the vent pipe must go below a joist and then up into
the last joist space to penetrate the header, two 45° elbows
should be used to reach the header rather than two 90°
elbows.
Upflow
Nondirect Vent (Single Pipe) Maximum Allowable Length of Vent/Flue Pipe—ft (m)
Number of Elbows
Unit Input (Btu) Pipe—in. (cm) 1 2 3 4 5 6 7 8
45,000 2 or 2¹⁄₂ (5.12 or 6.4) 71 (21.6) 68 (20.7) 65 (19.8) 62 (18.9) 59 (18) 56 (17.1) 53 (16.2) 50 (15.2)
70,000 2 or 2¹⁄₂ (5.12 or 6.4) 49 (14.9) 46 (14) 43 (13.1) 40 (12.2) 37 (11.3) 34 (10.4) 31 (9.5) 28 (8.5)
3 (7.6) 71 (21.6) 68 (20.7) 65 (19.8) 62 (18.9) 59 (18) 56 (17.1) 53 (16.2) 50 (15.2)
90,000 3 (7.6) 71 (21.6) 68 (20.7) 65 (19.8) 62 (18.9) 59 (18) 56 (17.1) 53 (16.2) 50 (15.2)
115,000 3 (7.6) 49 (14.9) 46 (14) 43 (13.1) 40 (12.2) 37 (11.3) 34 (10.4) 31 (9.5) 28 (8.5)
Counterflow
Direct Vent (Dual Pipe) Maximum Allowable Length of Vent/Flue Pipe—ft (m)
Number of Elbows
Unit Input (Btu) Pipe—in. (cm) 1 2 3 4 5 6 7 8
70,000 2 or 2¹⁄₂ (5.12 or 6.4) 61 (18.6) 58 (17.7) 55 (16.8) 52 (15.8) 49 (14.9) 46 (14) 43 (13.1) 40 (12.2)
3 (7.6) 71 (21.6) 68 (20.7) 65 (19.8) 62 (18.9) 59 (18) 56 (17.1) 53 (16.2) 50 (15.2)
90,000 2 or 2¹⁄₂ (5.12 or 6.4) 61 (18.6) 58 (17.7) 55 (16.8) 52 (15.8) 49 (14.9) 46 (14) 43 (13.1) 40 (12.2)
3 (7.6) 71 (21.6) 68 (20.7) 65 (19.8) 62 (18.9) 59 (18) 56 (17.1) 53 (16.2) 50 (15.2)
Comments to this Manuals