Whirlpool WGFD295 Instruction Manual

Browse online or download Instruction Manual for Water heaters & boilers Whirlpool WGFD295. Whirlpool WGFD295 Instruction manual User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 52
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
93% AND 95% 2-STAGE VARIABLE-SPEED GAS FURNACE
INSTALLATION INSTRUCTIONS
These furnaces comply with requirements embodied in the
American National Standard/National Standard of Canada ANSI
Z21.47-CSA-2.3 Gas Fired Central Furnaces.
WPIO-368C
Tradewinds Distributing Company, LLC
14610 Breakers Drive
Jacksonville, Florida 32258
Whirlpool Gold
®
Models
WGFD295,WGFM295
ATTENTION INSTALLATION PERSONNEL
As a professional installer, you have an obligation to know the product better than the customer. This includes all
safety precautions and related items. Prior to actual installation, thoroughly familiarize yourself with this instruction
manual. Pay special attention to all safety warnings. Often during installation or repair, it is possible to place
yourself in a position which is more hazardous than when the unit is in operations.
Remember, it is your responsibility to install the product safely and to know it well enough to be able to instruct a
customer in its safe use. Safety is a matter of common sense...a matter of thinking before acting. Most dealers have
a list of specific good safety practices...follow them.
The precautions listed in this installation manual are intended as supplemental to existing practices. However, if
there is a direct conflict between existing practices and the content of this manual, the precautions listed here take
precedence.
Placeholder
for Bar
Code
Page view 0
1 2 3 4 5 6 ... 51 52

Summary of Contents

Page 1 - INSTALLATION INSTRUCTIONS

93% AND 95% 2-STAGE VARIABLE-SPEED GAS FURNACE INSTALLATION INSTRUCTIONSThese furnaces comply with requirements embodied in the American National Stan

Page 2 - TABLE OF CONTENTS

10For installations above 7,000 ft (2,133.6 m), refer to your distributor for required kit(s).Contact the distributor for a tabular listing of appropr

Page 3

11Proper Vent/Flue and Combustion Air Piping PracticesAdhere to these instructions to ensure safe and proper furnace performance. The length, diameter

Page 4 - AND APPLICATION

12Vent/Flue PipeVent/flue pipe can be secured to the vent/flue coupling using the rubber coupling and worm gear hose clamps provided with this furnace

Page 5 - CONSIDERATIONS

13Alternate Vent/Flue LocationThe alternate vent/flue location is the large hole directly in line with the induced draft blower outlet. To use the alt

Page 6 - Goodman 48

14Alternate Vent/Flue Location—CounterflowAlternate Vent/Flue Location—Upflow/Horizontal (Counterflow Similar)Alternate Combustion Air Intake Location

Page 7 - Thermostat Location

15Nondirect Vent ApplicationsRefer to the following tables for applicable length, elbows and pipe diameter for construction of the vent/flue pipe syst

Page 8 - AND CONSIDERATIONS

16Vertical Vent Termination (Single Pipe)Alternate Vertical Vent Termination (Single Pipe)Standard Horizontal Vent Termination (Single Pipe)Standard H

Page 9 - INSTALLATIONS

17Vent/Flue and Combustion Air Pipe TerminationsThe vent/flue and combustion air pipes may terminate vertically, as through a roof, or horizontally, a

Page 10 - COMBUSTION AIR PIPE

18Vertical Vent Terminations (Dual Pipe)Horizontal terminations should be as shown in “Standard Horizontal Vent Terminations (Dual Pipe)” illustration

Page 11 - Standard Furnace Connections

19Alternate Horizontal Terminations (Dual Pipe)—Above Highest Anticipated Snow Level In a basement installation, the vent/flue pipe can be run betwee

Page 12 - Alternate Furnace Connections

2TABLE OF CONTENTSGAS FURNACE SAFETY PRECAUTIONS...3PRODUCT DESCRIPTION AND APPLICATION ...4Sh

Page 13 - Goodman 57

20Standard Right or Left Side Drain Hose ConnectionsAll installation positions require the use of the drain trap, hoses, tubes and clamps. The followi

Page 14 - Goodman 58

21Alternate Upright Upflow Connections—Right Side Only (Counterflow Similar)Upright Installations—Trap on Left SideNOTE: For left side trap installati

Page 15 - Vent/Flue Pipe Terminations

222. Secure Hose A to the front cover drain tap with a red hose clamp.3. Route Hose A to the rear right (down) side panel grommet holes.4. Cut ¹⁄₄&quo

Page 16 - Lengths and Diameters

23Horizontal Drain Trap Mounting—Left or Right Side Panel1. Position the drain trap against the side panel with the drain tubes inserted into the trap

Page 17

24To ensure proper unit grounding, the ground wire should run from the furnace ground screw located inside the furnace junction box all the way back t

Page 18

25A single-stage thermostat with only one heating stage may be used to control this furnace. The application of a single-stage thermostat does not off

Page 19 - DRAIN TRAP

26Optional Accessories WiringIf it is necessary for the installer to supply additional line voltage wiring to the inside of the furnace, the wiring mu

Page 20 - Drain Hose Connections

27Gas Control ValveThis furnace is equipped with a 24-volt gas control valve controlled during the furnace operation by the integrated control module.

Page 21 - Left or Right Side Panel

28Gas Piping Connections—UpflowGas Piping Connections—CounterflowGas Piping Connections—Horizontal UpflowGas Piping Connections—Horizontal Counterflow

Page 22 - (Counterflow Similar)

29Direct/Standard Inlet PipingWhen gas piping enters directly to the gas control valve through the standard inlet hole, the installer must supply stra

Page 23 - ELECTRICAL CONNECTIONS

3GAS FURNACE SAFETY PRECAUTIONSPlease adhere to the following warnings and cautions when installing, adjusting, altering, servicing or operating the f

Page 24 - Goodman Important Note

30Sizing Between 1st and 2nd Stage Regulator*Maximum propane capacities listed are based on 2 psig pressure drop at 10 psig setting. Capacities in 1,0

Page 25 - Goodman 115

31CIRCULATING AIR AND FILTERSDuctwork—Airflow Duct systems and register sizes must be properly designed for the CFM and external static pressure rati

Page 26 - GAS SUPPLY AND PIPING

32*Minimum filter area dictated by heating airflow requirement.Upright InstallationsDepending on the installation and/or customer preference, filters

Page 27 - Goodman 62

33START-UP PROCEDURE AND ADJUSTMENTThis furnace must have a 115 VAC power supply properly connected and grounded. Proper polarity must be maintained f

Page 28 - Gas Piping Connections—Upflow

34Gas Control Valve—Honeywell 2-Stage VR9205Gas Control Valve—Honeywell VR9205 Connected to Manometer1. Turn off the gas supply to the furnace at the

Page 29 - Goodman 72

354. Attach a hose and manometer to the outlet pressure barb fitting (Honeywell valve) or outlet pressure boss (White-Rodgers valve).5. Turn on the ga

Page 30

364. Subtract the return air temperature from the supply air temperature to determine the air temperature rise. Allow adequate time for thermometer re

Page 31 - CIRCULATING AIR AND FILTERS

37Profile A Provides a 1-minute Off delay at 100% of the cooling demand airflow.Profile B Ramps up to 50% of the full cooling demand airflow for 30

Page 32

38Blower Heat Off Delay TimingsThe integrated control module provides a selectable heat-off delay function. The heat off delay period may be set to 90

Page 33 - Manometer

39 R and W1 (or R and W1/W2) thermostat contacts open, completing the call for heat. Gas control valve closes, extinguishing flame. Induced draft b

Page 34 - Goodman 65

4PRODUCT DESCRIPTION AND APPLICATIONShipping InspectionAll units are securely packed in shipping containers tested according to International Safe Tra

Page 35 - Temperature Rise

40Pressure SwitchesThe pressure switches are normally-open (closed during operation), negative air pressure-activated switches. They monitor the airfl

Page 36 - Circulator Blower Speeds

41BurnersVisually inspect the burner flames periodically during the heating season. Turn on the furnace at the thermostat and allow several minutes fo

Page 37

42TROUBLESHOOTINGElectrostatic Discharge (ESD) PrecautionsNOTE: Discharge static electricity accumulated in the body before touching the unit. An elec

Page 38 - OF OPERATION

43Diagnostic ChartThe dual 7-segment LED display will display an error code that may contain a letter and number. The error code may be used to assist

Page 39 - SAFETY CIRCUIT DESCRIPTION

44 Furnace fails to operate. Integrated control module LED display provides “E1” error code.E1 Low-stage pressure switch circuit is closed at start

Page 40 - MAINTENANCE

45 Induced draft blower and circulator blower runs continuously. No furnace operation. Integrated control module LED display provides “E4” error cod

Page 41 - Functional Parts List

46 Furnace fails to operate on high stage. Furnace operates normally on low stage. Integrated control module LED display provides “E9” error code.E9

Page 42 - TROUBLESHOOTING

47 Furnace fails to operate. Integrated control module LED display provides “b0” error code.b0 Circulator blower motor is not running when it shoul

Page 43 - Goodman 118 Long

48 Furnace fails to operate. Integrated control module LED display provides “b4” error code.b4 Circulator blower motor senses a loss of rotor cont

Page 44

49DIP Switch ChartSwitch DIP Switch NumberBank Purpose Function 1 2 3 4 5 6 7 8 9 10S1 Heat Off Delay90 Seconds Off Off --- --- --- --- --- --- --- --

Page 45

5Product ApplicationThis furnace is primarily designed for residential home-heating applications. IMPORTANT: This furnace is not designed or certifi

Page 46

50WIRING DIAGRAMCheck codes for proper wiring and circuit protection before installation.NOTES:1. Set heat anticipator on room thermostat at 0.7 amps.

Page 47

51WIRING DIAGRAMCheck codes for proper wiring and circuit protection before installation.NOTES:1. Set heat anticipator on room thermostat at 0.7 amps.

Page 48

ASSISTANCE OR SERVICEIf you need further assistance, you can write to the below address with any questions or concerns:Tradewinds Distributing Company

Page 49 - DIP Switch Chart

6 Centrally locate the furnace with respect to the proposed or existing air distribution system. Check that the temperature of the return air enteri

Page 50 - WIRING DIAGRAM

7A furnace installed in a confined space (for example, a closet or utility room) must have 2 ventilation openings with a total minimum free area of 0.

Page 51

8Combustion and Ventilation Air RequirementsImproved construction and additional insulation in buildings have reduced heat loss by reducing air infilt

Page 52 - ASSISTANCE OR SERVICE

9See “Vent/Flue Pipe and Combustion Air Pipe” for details concerning the conversion to the alternate vent/flue and combustion air connections.When usi

Comments to this Manuals

No comments